Quick answer: Before you trust an ETABS model, check seven things: geometry and supports, loads storey by storey, mass, load combinations, seismic and modal setup, wind, and stiffness, diaphragms and P-Δ. The fastest single check is the Mass Summary by Story table: one floor much heavier than its neighbours almost always means a load input error. The 30 checks below came from a real review of a 50+ storey tower model, where a roof load typed as 40 kPa instead of 4 kPa added about 10,000 tonnes at the top of the building.
An ETABS model can run with no warnings, produce neat drift plots and still be wrong. The software checks that the model can be solved. It does not check that the loads, supports and combinations are the ones you meant. On a tall building one wrong number can shift the period, base shear, wall forces and pile loads together.
This checklist comes from a review I carried out on a real high-rise model: a residential tower of more than 50 storeys, about 170–190 m tall, standing on a car-park podium with a thick transfer slab, in a low-seismicity region of Southeast Asia. Project details are left out. The mistakes are real, and every one of them is common. They are grouped in the order I check a model, with the ETABS table or menu to look in and the red flag to look for.
How to use this checklist
- Work from tables, not the 3D view. Almost every check below uses Display > Show Tables (Ctrl+T). Export to Excel and sort: errors stand out in a sorted column far faster than on screen.
- Review a copy. Save the model under a new name before you change anything, so the original stays as issued.
- Rank what you find. I use three levels: critical (changes results a lot), high (modelling or code consistency) and medium (refine or confirm). Fix the loads first, because mass, periods and seismic forces all depend on them.
A. Geometry, supports and connectivity
| # | Check | Where in ETABS | Red flag |
|---|---|---|---|
| 1 | Model passes the model check with sensible tolerances | Analyze > Check Model | Overlapping members, unconnected joints, very short frames |
| 2 | Base supports match the real foundation | Table: Joint Assignments – Restraints and Springs | All bases pinned on a piled tower; a spring property defined but assigned to nothing |
| 3 | Columns and walls start and stop at the right levels | Elevation views; table Frame Assignments – Summary sorted by storey | A column stopping one floor short of the transfer slab, or a wall that floats |
| 4 | Beam insertion points do not double-count concrete | Assign > Frame > Insertion Point | Downstand beams set to top-centre with the slab overlap still counted, adding about 30% extra self-weight |
| 5 | Slab openings, ramps and voids are modelled | Plan views of podium levels | A car park with no ramp openings: the diaphragm is too stiff and ramp loads are missing |
In the tower I reviewed, every base joint was pinned, while an older file in the same folder was named as a fixed-base model. A spring property for the piles had been defined but never assigned. We ran both pinned and fixed versions: periods, base shear and drift changed by only 1–3%, but column and wall base moments changed completely. That is why the design used the envelope of the two.
B. Loads, storey by storey
| # | Check | Where in ETABS | Red flag |
|---|---|---|---|
| 6 | Superimposed dead load (SDL) values are realistic on every floor | Table: Shell Loads – Uniform, sorted by load value | A value about 10 times its neighbours (40 kPa where 4 kPa was meant) |
| 7 | No floor is left without loads | Same table, filtered by storey | One storey with no SDL, live load or partitions, often the first floor above a transfer |
| 8 | Heavy soil, fill and landscape loads are only where they really are | Plan view with load values shown | 30 kPa of planting soil over a whole slab, including the part covered by the tower |
| 9 | Live loads match the use of each area | Same table | 1.5 kPa on flat corridors and lobbies (BS 6399 and EN 1991 give 3.0 kPa); a ground-level drop-off at 1.5 kPa |
| 10 | Partition line loads are on the right members, not over walls | Table: Frame Loads – Distributed | Line loads on beams that sit on top of RC walls (double counting) |
| 11 | Every unusual load has an owner | Same table, sorted by value | Large line loads on a few beams per floor that nobody can explain (lift, stair, riser, tank?) |
Load errors were the biggest findings in that review. The roof carried an SDL of 40 kPa over its full area, about 10,000 tonnes at the very top of the tower. The first residential floor above the transfer slab had no SDL, partitions or live load at all, about 15 MN missing directly on the most critical element. And a ground-level fill load sat on the structure instead of on the ground, adding mass that should never have gone into the seismic analysis.
C. Mass: the fastest sanity check
| # | Check | Where in ETABS | Red flag |
|---|---|---|---|
| 12 | Storey masses follow a smooth, explainable pattern | Table: Mass Summary by Story; plot mass against level | A roof or podium level 3 times heavier than a typical floor with no tank or plant to explain it |
| 13 | Typical-floor mass per m² is reasonable | Floor mass ÷ floor area | Outside about 10–18 kPa equivalent for a wall-dense RC residential floor |
| 14 | Mass source uses the right live-load fraction | Define > Mass Source | 0.3 × live load everywhere, when car-park floors need 0.6 (EN 1990 ψ2) |
| 15 | Total weight agrees with a hand estimate | Table: Base Reactions for Dead + SDL | More than about 10% away from floor area × typical kPa summed over the height |
Plot the storey mass table as a bar chart before anything else. In the tower above, the roof showed a mass more than three times that of a typical floor. It took two minutes to spot and led straight to the 40 kPa typo. A wall-dense tower floor came out at about 15–16 kPa equivalent, which is normal.
D. Load cases and combinations
| # | Check | Where in ETABS | Red flag |
|---|---|---|---|
| 16 | Every load case you defined is used in at least one combination | Table: Load Combination Definitions | Earthquake cases (EQX, RSX…) that appear in no combination, so the seismic analysis does nothing for design |
| 17 | The “dead load beneficial” wind combination is there | Same table | No 1.0Gk + 1.4Wk (BS 8110) or 1.0G + 1.5W (EN 1990): uplift, wall tension and pile tension are never checked |
| 18 | Notional horizontal loads are checked | Separate load pattern | A heavy podium where 1.5% of dead load (BS 8110 cl. 3.1.4.2) could exceed the wind load, but nobody checked |
| 19 | Serviceability and foundation combinations exist | Same table | No G + Q for deflection; pile service combinations with wind but no live load |
| 20 | Wind torsion is checked in both directions | Define > Load Patterns > Modify Lateral Load | Eccentricity with one sign only, so “+force with −torsion” is never checked |
E. Seismic and modal analysis
| # | Check | Where in ETABS | Red flag |
|---|---|---|---|
| 21 | The response spectrum and the static seismic case use the same parameters | Define > Functions > Response Spectrum and the seismic load pattern | Same ground type typed in both, but different S, TB, TC, TD values filled in |
| 22 | The response spectrum case is set up simply | Define > Load Cases | Odd scale factors and an orthogonal component hidden inside the case; better: scale by g only, then combine ±RSX ±0.3RSY in the combinations (EN 1998-1 cl. 4.3.3.5.1) |
| 23 | Enough modes for at least 90% mass participation in each direction | Table: Modal Participating Mass Ratios | Eigen with 20 modes on a tower with a heavy podium; use Ritz vectors (UX, UY, RZ) and check the cumulative sum (EN 1998-1 cl. 4.3.3.3.1) |
| 24 | The analysis method is valid for this building | Compare T1 with 4TC and 2 s | Relying on the lateral force method when T1 is far above 2 s; the response spectrum must govern |
| 25 | Irregularity at the transfer level is recognised | Table: Story Stiffness; elevation of the walls | All tower walls stop at the transfer, leaving two cores and a flat-slab frame below, with no reduction in the behaviour factor |
On the tower I reviewed, once the missing combinations were added, earthquake governed the lateral design in the short direction at every storey, about 1.35–1.5 times the factored wind in the podium. That is in a region usually thought of as “wind governs”. The lesson: never assume, run both and compare storey shears.
F. Wind
| # | Check | Where in ETABS | Red flag |
|---|---|---|---|
| 26 | The dynamic factor is calculated, not guessed | Wind load pattern | A typed-in constant on a tower whose first frequency is well below 1 Hz; no cross-wind or comfort (acceleration) check. Above about 150 m a wind tunnel test is normal |
| 27 | Basic wind speed and terrain come from the current code edition | Wind load pattern | A speed from a superseded map, or a terrain category nobody can justify |
G. Stiffness, diaphragms and second-order effects
| # | Check | Where in ETABS | Red flag |
|---|---|---|---|
| 28 | Cracked-section modifiers and concrete E suit the limit state | Table: Area Section Property Definitions – Summary; Material Properties | One set of modifiers for everything; one wall section with odd values; cylinder-strength E used with cube grades (10–20% too stiff, period and drift too low) |
| 29 | Diaphragms and mesh are right where force transfers | Assign > Shell > Diaphragms; mesh settings | Rigid diaphragms at the transfer and podium levels, which hide in-plane slab and collector forces; a coarse 1.5 m mesh on a 3 m thick transfer slab |
| 30 | P-Δ and gravity sequence suit a tall building | Define > P-Delta Options; load case type | Full dead load applied in one linear step on 50+ floors (use staged or sequential construction); a light P-Δ load used for ULS |
After the run: 6 quick result checks
- Base reactions for each gravity case equal the loads you applied, to within rounding.
- No negative eigenvalues or instability warnings in the analysis log.
- First period is in a believable range. A very rough guide for RC towers is 0.1 × number of storeys in seconds; the tower above came out at about 8 s, heavier and taller than that rule suggests, and the mass check explained why.
- Response spectrum base shear is compared with the static base shear and the code minimum.
- Drift under service wind is within your limit (H/500 is common) and you know which storey governs. Here the peak was in the podium, not at the top.
- Torsion ratio (maximum ÷ average displacement) is below about 1.2, or the building is treated as torsionally irregular.
What the review found: the top 6
| Finding | Effect | Fix |
|---|---|---|
| Roof SDL typed as 40 kPa (meant 4) | About +10,000 t at the top: period, seismic forces, wall and pile loads all too high | Correct the value; apply tanks and plant locally |
| Seismic cases in no combination | No earthquake design at all | Add the full EN 1998 combination set |
| All bases pinned, pile springs unused | Zero base moments in columns and pile caps | Fixed and pinned envelope, then pile springs |
| No loads on the first floor above the transfer | About 15 MN missing on the transfer slab | Apply SDL, partitions and live load |
| Landscape load over the whole podium slab | Load under the tower footprint that cannot exist | Split the slab and load only real planters |
| 20 eigen modes only | Mass participation near or below 90% | Ritz vectors, 60–100 modes |
None of these show up as an error message. All six were found in a day by reading tables, plotting storey mass and asking “does this number make sense?”
New to ETABS? Start with our step-by-step ETABS tutorial for a multi-storey RC building, and for slab design see how to read CSI SAFE slab reinforcement results. For material inputs, see Young's modulus of concrete and the density of steel.
FAQ
How do I check an ETABS model for errors?
Run Analyze > Check Model for geometry, then review the input tables: shell and frame loads sorted by value, restraints, mass source, load combinations, response spectrum and modal cases. After the run, compare base reactions with the applied loads, check the storey mass table, modal mass participation, drift and torsion ratio.
Which ETABS table shows the weight of each floor?
Mass Summary by Story (under Model > Structure Data in the table list) gives the mass of each storey. Divide by the floor area for a kPa equivalent and compare floors with each other.
How many modes do I need in ETABS?
Enough for the cumulative mass participation to reach at least 90% in each horizontal direction (EN 1998-1 cl. 4.3.3.3.1; ASCE 7 has the same 90% rule). For tall buildings with heavy podiums, Ritz vectors reach 90% with far fewer modes than eigenvectors.
Should ETABS base supports be pinned or fixed?
Model what the foundation actually provides. Columns on a pile cap are closer to fixed, and the best model uses pile-group springs. If you are unsure, run pinned and fixed versions and design for the envelope: global results barely change, but base moments do.
What is a reasonable floor mass for a concrete building?
For RC residential floors, the seismic mass usually works out at about 10–18 kPa equivalent, depending on slab thickness and how many walls there are. Values far above that point to a load input error.
References
- CSI, ETABS User's Guide and Analysis Reference Manual (Computers and Structures, Inc.).
- EN 1998-1:2004, Eurocode 8: Design of structures for earthquake resistance, clauses 4.2.3, 4.3.1, 4.3.3.
- EN 1990:2002, Eurocode: Basis of structural design, Annex A1 (ψ factors).
- BS 8110-1:1997, Structural use of concrete, clauses 2.4 and 3.1.4.2.
Written by Engr. Abdul Latif, Senior Structural Engineer, from a real tower model review. Project details have been removed and figures rounded. Published November 2026.