ETABS Model Review Checklist: 30 Checks Before You Trust a High-Rise Model

Quick answer: Before you trust an ETABS model, check seven things: geometry and supports, loads storey by storey, mass, load combinations, seismic and modal setup, wind, and stiffness, diaphragms and P-Δ. The fastest single check is the Mass Summary by Story table: one floor much heavier than its neighbours almost always means a load input error. The 30 checks below came from a real review of a 50+ storey tower model, where a roof load typed as 40 kPa instead of 4 kPa added about 10,000 tonnes at the top of the building.
ETABS model review checklist: storey mass profile showing a roof load spike and a missing-load floor above the transfer slab, with the 7 groups of 30 checks


An ETABS model can run with no warnings, produce neat drift plots and still be wrong. The software checks that the model can be solved. It does not check that the loads, supports and combinations are the ones you meant. On a tall building one wrong number can shift the period, base shear, wall forces and pile loads together.

This checklist comes from a review I carried out on a real high-rise model: a residential tower of more than 50 storeys, about 170–190 m tall, standing on a car-park podium with a thick transfer slab, in a low-seismicity region of Southeast Asia. Project details are left out. The mistakes are real, and every one of them is common. They are grouped in the order I check a model, with the ETABS table or menu to look in and the red flag to look for.

How to use this checklist

  • Work from tables, not the 3D view. Almost every check below uses Display > Show Tables (Ctrl+T). Export to Excel and sort: errors stand out in a sorted column far faster than on screen.
  • Review a copy. Save the model under a new name before you change anything, so the original stays as issued.
  • Rank what you find. I use three levels: critical (changes results a lot), high (modelling or code consistency) and medium (refine or confirm). Fix the loads first, because mass, periods and seismic forces all depend on them.

A. Geometry, supports and connectivity

#CheckWhere in ETABSRed flag
1Model passes the model check with sensible tolerancesAnalyze > Check ModelOverlapping members, unconnected joints, very short frames
2Base supports match the real foundationTable: Joint Assignments – Restraints and SpringsAll bases pinned on a piled tower; a spring property defined but assigned to nothing
3Columns and walls start and stop at the right levelsElevation views; table Frame Assignments – Summary sorted by storeyA column stopping one floor short of the transfer slab, or a wall that floats
4Beam insertion points do not double-count concreteAssign > Frame > Insertion PointDownstand beams set to top-centre with the slab overlap still counted, adding about 30% extra self-weight
5Slab openings, ramps and voids are modelledPlan views of podium levelsA car park with no ramp openings: the diaphragm is too stiff and ramp loads are missing

In the tower I reviewed, every base joint was pinned, while an older file in the same folder was named as a fixed-base model. A spring property for the piles had been defined but never assigned. We ran both pinned and fixed versions: periods, base shear and drift changed by only 1–3%, but column and wall base moments changed completely. That is why the design used the envelope of the two.

B. Loads, storey by storey

#CheckWhere in ETABSRed flag
6Superimposed dead load (SDL) values are realistic on every floorTable: Shell Loads – Uniform, sorted by load valueA value about 10 times its neighbours (40 kPa where 4 kPa was meant)
7No floor is left without loadsSame table, filtered by storeyOne storey with no SDL, live load or partitions, often the first floor above a transfer
8Heavy soil, fill and landscape loads are only where they really arePlan view with load values shown30 kPa of planting soil over a whole slab, including the part covered by the tower
9Live loads match the use of each areaSame table1.5 kPa on flat corridors and lobbies (BS 6399 and EN 1991 give 3.0 kPa); a ground-level drop-off at 1.5 kPa
10Partition line loads are on the right members, not over wallsTable: Frame Loads – DistributedLine loads on beams that sit on top of RC walls (double counting)
11Every unusual load has an ownerSame table, sorted by valueLarge line loads on a few beams per floor that nobody can explain (lift, stair, riser, tank?)

Load errors were the biggest findings in that review. The roof carried an SDL of 40 kPa over its full area, about 10,000 tonnes at the very top of the tower. The first residential floor above the transfer slab had no SDL, partitions or live load at all, about 15 MN missing directly on the most critical element. And a ground-level fill load sat on the structure instead of on the ground, adding mass that should never have gone into the seismic analysis.

C. Mass: the fastest sanity check

#CheckWhere in ETABSRed flag
12Storey masses follow a smooth, explainable patternTable: Mass Summary by Story; plot mass against levelA roof or podium level 3 times heavier than a typical floor with no tank or plant to explain it
13Typical-floor mass per m² is reasonableFloor mass ÷ floor areaOutside about 10–18 kPa equivalent for a wall-dense RC residential floor
14Mass source uses the right live-load fractionDefine > Mass Source0.3 × live load everywhere, when car-park floors need 0.6 (EN 1990 ψ2)
15Total weight agrees with a hand estimateTable: Base Reactions for Dead + SDLMore than about 10% away from floor area × typical kPa summed over the height

Plot the storey mass table as a bar chart before anything else. In the tower above, the roof showed a mass more than three times that of a typical floor. It took two minutes to spot and led straight to the 40 kPa typo. A wall-dense tower floor came out at about 15–16 kPa equivalent, which is normal.

D. Load cases and combinations

#CheckWhere in ETABSRed flag
16Every load case you defined is used in at least one combinationTable: Load Combination DefinitionsEarthquake cases (EQX, RSX…) that appear in no combination, so the seismic analysis does nothing for design
17The “dead load beneficial” wind combination is thereSame tableNo 1.0Gk + 1.4Wk (BS 8110) or 1.0G + 1.5W (EN 1990): uplift, wall tension and pile tension are never checked
18Notional horizontal loads are checkedSeparate load patternA heavy podium where 1.5% of dead load (BS 8110 cl. 3.1.4.2) could exceed the wind load, but nobody checked
19Serviceability and foundation combinations existSame tableNo G + Q for deflection; pile service combinations with wind but no live load
20Wind torsion is checked in both directionsDefine > Load Patterns > Modify Lateral LoadEccentricity with one sign only, so “+force with −torsion” is never checked

E. Seismic and modal analysis

#CheckWhere in ETABSRed flag
21The response spectrum and the static seismic case use the same parametersDefine > Functions > Response Spectrum and the seismic load patternSame ground type typed in both, but different S, TB, TC, TD values filled in
22The response spectrum case is set up simplyDefine > Load CasesOdd scale factors and an orthogonal component hidden inside the case; better: scale by g only, then combine ±RSX ±0.3RSY in the combinations (EN 1998-1 cl. 4.3.3.5.1)
23Enough modes for at least 90% mass participation in each directionTable: Modal Participating Mass RatiosEigen with 20 modes on a tower with a heavy podium; use Ritz vectors (UX, UY, RZ) and check the cumulative sum (EN 1998-1 cl. 4.3.3.3.1)
24The analysis method is valid for this buildingCompare T1 with 4TC and 2 sRelying on the lateral force method when T1 is far above 2 s; the response spectrum must govern
25Irregularity at the transfer level is recognisedTable: Story Stiffness; elevation of the wallsAll tower walls stop at the transfer, leaving two cores and a flat-slab frame below, with no reduction in the behaviour factor

On the tower I reviewed, once the missing combinations were added, earthquake governed the lateral design in the short direction at every storey, about 1.35–1.5 times the factored wind in the podium. That is in a region usually thought of as “wind governs”. The lesson: never assume, run both and compare storey shears.

F. Wind

#CheckWhere in ETABSRed flag
26The dynamic factor is calculated, not guessedWind load patternA typed-in constant on a tower whose first frequency is well below 1 Hz; no cross-wind or comfort (acceleration) check. Above about 150 m a wind tunnel test is normal
27Basic wind speed and terrain come from the current code editionWind load patternA speed from a superseded map, or a terrain category nobody can justify

G. Stiffness, diaphragms and second-order effects

#CheckWhere in ETABSRed flag
28Cracked-section modifiers and concrete E suit the limit stateTable: Area Section Property Definitions – Summary; Material PropertiesOne set of modifiers for everything; one wall section with odd values; cylinder-strength E used with cube grades (10–20% too stiff, period and drift too low)
29Diaphragms and mesh are right where force transfersAssign > Shell > Diaphragms; mesh settingsRigid diaphragms at the transfer and podium levels, which hide in-plane slab and collector forces; a coarse 1.5 m mesh on a 3 m thick transfer slab
30P-Δ and gravity sequence suit a tall buildingDefine > P-Delta Options; load case typeFull dead load applied in one linear step on 50+ floors (use staged or sequential construction); a light P-Δ load used for ULS

After the run: 6 quick result checks

  1. Base reactions for each gravity case equal the loads you applied, to within rounding.
  2. No negative eigenvalues or instability warnings in the analysis log.
  3. First period is in a believable range. A very rough guide for RC towers is 0.1 × number of storeys in seconds; the tower above came out at about 8 s, heavier and taller than that rule suggests, and the mass check explained why.
  4. Response spectrum base shear is compared with the static base shear and the code minimum.
  5. Drift under service wind is within your limit (H/500 is common) and you know which storey governs. Here the peak was in the podium, not at the top.
  6. Torsion ratio (maximum ÷ average displacement) is below about 1.2, or the building is treated as torsionally irregular.

What the review found: the top 6

FindingEffectFix
Roof SDL typed as 40 kPa (meant 4)About +10,000 t at the top: period, seismic forces, wall and pile loads all too highCorrect the value; apply tanks and plant locally
Seismic cases in no combinationNo earthquake design at allAdd the full EN 1998 combination set
All bases pinned, pile springs unusedZero base moments in columns and pile capsFixed and pinned envelope, then pile springs
No loads on the first floor above the transferAbout 15 MN missing on the transfer slabApply SDL, partitions and live load
Landscape load over the whole podium slabLoad under the tower footprint that cannot existSplit the slab and load only real planters
20 eigen modes onlyMass participation near or below 90%Ritz vectors, 60–100 modes

None of these show up as an error message. All six were found in a day by reading tables, plotting storey mass and asking “does this number make sense?”

New to ETABS? Start with our step-by-step ETABS tutorial for a multi-storey RC building, and for slab design see how to read CSI SAFE slab reinforcement results. For material inputs, see Young's modulus of concrete and the density of steel.

FAQ

How do I check an ETABS model for errors?

Run Analyze > Check Model for geometry, then review the input tables: shell and frame loads sorted by value, restraints, mass source, load combinations, response spectrum and modal cases. After the run, compare base reactions with the applied loads, check the storey mass table, modal mass participation, drift and torsion ratio.

Which ETABS table shows the weight of each floor?

Mass Summary by Story (under Model > Structure Data in the table list) gives the mass of each storey. Divide by the floor area for a kPa equivalent and compare floors with each other.

How many modes do I need in ETABS?

Enough for the cumulative mass participation to reach at least 90% in each horizontal direction (EN 1998-1 cl. 4.3.3.3.1; ASCE 7 has the same 90% rule). For tall buildings with heavy podiums, Ritz vectors reach 90% with far fewer modes than eigenvectors.

Should ETABS base supports be pinned or fixed?

Model what the foundation actually provides. Columns on a pile cap are closer to fixed, and the best model uses pile-group springs. If you are unsure, run pinned and fixed versions and design for the envelope: global results barely change, but base moments do.

What is a reasonable floor mass for a concrete building?

For RC residential floors, the seismic mass usually works out at about 10–18 kPa equivalent, depending on slab thickness and how many walls there are. Values far above that point to a load input error.

References

  • CSI, ETABS User's Guide and Analysis Reference Manual (Computers and Structures, Inc.).
  • EN 1998-1:2004, Eurocode 8: Design of structures for earthquake resistance, clauses 4.2.3, 4.3.1, 4.3.3.
  • EN 1990:2002, Eurocode: Basis of structural design, Annex A1 (ψ factors).
  • BS 8110-1:1997, Structural use of concrete, clauses 2.4 and 3.1.4.2.

Written by Engr. Abdul Latif, Senior Structural Engineer, from a real tower model review. Project details have been removed and figures rounded. Published November 2026.