Construction of The Erie Canal
The construction of the Erie Canal was one of the key engineering and political accomplishments of the 19th century, The Erie Canal is a canal in New York that originally ran about 363 miles (584 km) from Albany, on the Hudson River to Buffalo, at Lake Erie. Built to create a navigable water route from New York City and the Atlantic Ocean to the Great Lakes. In order to keep pace with the growing demands of traffic, the Erie Canal was enlarged between 1836 and 1862.
The "Enlarged Erie Canal" was 70 feet wide and 7 feet deep, and could handle boats carrying 240 tons. The number of locks was reduced to 72. Most of the remaining traces of the Old Erie Canal are from the Enlarged Erie era. The canal was completed in only 8 years at a cost of $7,000,000. When completed on October 26, 1825, DeWitt Clinton (by then Governor of New York) , the driving force behind the project, led the opening ceremonies and rode the canal boat Seneca Chief from Buffalo to New York City.
Construction began July 4, 1817, at Rome, New York
Construction of The Erie Canal began July 4, 1817, at Rome, New York. The first 15 miles (24 km), from Rome to Utica, opened in 1819. At that rate the canal would not be finished for 30 years. The main hold-ups were felling trees to clear a path through virgin forest and moving excavated soil, which took longer than expected, but the builders devised ways to solve these problems. To fell a tree, they threw rope over the top branches and winched it down. They pulled out the stumps with an innovative stump puller. A pair of huge wheels were mounted loose on an axle.
A large wheel, barely smaller than the others, was fixed to the center of the axle. A chain was wrapped around the axle and hooked to the stump. A rope was wrapped around the center wheel and hooked to a team of oxen. The mechanical advantage (torque) obtained ripped the stumps out of the soil. Soil to be moved was shoveled into large wheelbarrows that were dumped into mule-pulled carts. Using a scraper and a plow, a three-man team with oxen, horses, and mules could build a mile in a year.
Challenge during construction of The Erie Canal
The remaining problem was finding labor, and increased immigration helped fill the need. Many of the laborers working on the canal were Scots Irish, who had recently come to the United States. Construction continued at an increased rate as new workers arrived. When the canal reached Montezuma Marsh (at the outlet of Cayuga Lake west of Syracuse), it was rumored over 1,000 workers died of "swamp fever" (malaria), and construction was temporarily stopped. The entire canal was officially completed on October 26, 1825.
The event was marked by a statewide "Grand Celebration," culminating in successive cannon shots along the length of the canal and the Hudson, a 90-minute cannonade from Buffalo to New York City. A flotilla of boats, led by Governor Dewitt Clinton aboard the Seneca Chief, sailed from Buffalo to New York City in ten days. Clinton then ceremonially poured Lake Erie water into New York Harbor to mark the "Wedding of the Waters".
Construction of The Erie Canal completed on October 26, 1825
The canal was completed in only 8 years at a cost of $7,000,000. When completed on October 26, 1825, DeWitt Clinton (by then Governor of New York) , the driving force behind the project, led the opening ceremonies and rode the canal boat Seneca Chief from Buffalo to New York City.
The construction of the Erie Canal was one of the key engineering and political accomplishments of the 19th century, The Erie Canal is a canal in New York that originally ran about 363 miles (584 km) from Albany, on the Hudson River to Buffalo, at Lake Erie. Built to create a navigable water route from New York City and the Atlantic Ocean to the Great Lakes. In order to keep pace with the growing demands of traffic, the Erie Canal was enlarged between 1836 and 1862.
The "Enlarged Erie Canal" was 70 feet wide and 7 feet deep, and could handle boats carrying 240 tons. The number of locks was reduced to 72. Most of the remaining traces of the Old Erie Canal are from the Enlarged Erie era. The canal was completed in only 8 years at a cost of $7,000,000. When completed on October 26, 1825, DeWitt Clinton (by then Governor of New York) , the driving force behind the project, led the opening ceremonies and rode the canal boat Seneca Chief from Buffalo to New York City.
Construction began July 4, 1817, at Rome, New York
Construction of The Erie Canal began July 4, 1817, at Rome, New York. The first 15 miles (24 km), from Rome to Utica, opened in 1819. At that rate the canal would not be finished for 30 years. The main hold-ups were felling trees to clear a path through virgin forest and moving excavated soil, which took longer than expected, but the builders devised ways to solve these problems. To fell a tree, they threw rope over the top branches and winched it down. They pulled out the stumps with an innovative stump puller. A pair of huge wheels were mounted loose on an axle.
A large wheel, barely smaller than the others, was fixed to the center of the axle. A chain was wrapped around the axle and hooked to the stump. A rope was wrapped around the center wheel and hooked to a team of oxen. The mechanical advantage (torque) obtained ripped the stumps out of the soil. Soil to be moved was shoveled into large wheelbarrows that were dumped into mule-pulled carts. Using a scraper and a plow, a three-man team with oxen, horses, and mules could build a mile in a year.
Challenge during construction of The Erie Canal
The remaining problem was finding labor, and increased immigration helped fill the need. Many of the laborers working on the canal were Scots Irish, who had recently come to the United States. Construction continued at an increased rate as new workers arrived. When the canal reached Montezuma Marsh (at the outlet of Cayuga Lake west of Syracuse), it was rumored over 1,000 workers died of "swamp fever" (malaria), and construction was temporarily stopped. The entire canal was officially completed on October 26, 1825.
The event was marked by a statewide "Grand Celebration," culminating in successive cannon shots along the length of the canal and the Hudson, a 90-minute cannonade from Buffalo to New York City. A flotilla of boats, led by Governor Dewitt Clinton aboard the Seneca Chief, sailed from Buffalo to New York City in ten days. Clinton then ceremonially poured Lake Erie water into New York Harbor to mark the "Wedding of the Waters".
Construction of The Erie Canal completed on October 26, 1825
The canal was completed in only 8 years at a cost of $7,000,000. When completed on October 26, 1825, DeWitt Clinton (by then Governor of New York) , the driving force behind the project, led the opening ceremonies and rode the canal boat Seneca Chief from Buffalo to New York City.